2017年1月4日星期三

04012017

  Check the drawings of Escalator, sump pit.
  Fit the temporary building in Plot F.

2017年1月3日星期二

03012016

  First day of 2017;3
  send plot P plan to client.
  Improve staircase dimension(bside escalator)
  Check staircase detail drawings.
  Improve the detail drawing of sump pit.
  Improve the lift detail drawing.